Description:
Renovation
and restoration of the lower mall in the Ferry Building required the
installation of 30 custom gates. Big D collaborated with the architect,
building owner, and the general contractor to engineer, test and fabricate
these gates to standards approved by the Port Historical Society and
a cost within the owner's budget.